Reduce project risk before equipment reaches your production floor.

Turn the real component, required hand-off and operating conditions into measurable trials, defined interfaces and a documented acceptance route.

SAMPLE-LED DELIVERY

Six stages from application brief to site handover.

Each stage removes a different uncertainty while decisions are still practical to change.

01

Application definition

Record every component and variant, drawing revision, finish, accepted orientation, sustained rate, space, utilities and site standard.

02

Representative trials

Test the proposed movement, separation, orientation, inspection or grasp strategy against agreed production samples.

03

Concept & interfaces

Define layout, equipment principle, buffers, hand-off, signals, safety boundary, responsibilities and acceptance philosophy.

04

Detailed engineering

Develop tooling, controls, vision recipes, robot paths, guarding, access, documentation and changeover provisions.

05

Factory acceptance

Run the agreed sample population and verify rate, quality, replenishment, alarms, recovery, safety and documentation.

06

Installation & handover

Install, connect, commission, train and support the move from controlled test conditions to production operation.

FACTORY ACCEPTANCE

Test the operating conditions that matter after handover.

A good FAT does more than run ideal parts at a short peak rate. It proves the agreed production behaviours within the supplied scope.

Test areaExample evidenceWhy it matters
Sample populationIdentified production lots, variants and agreed difficult partsLinks the result to known component conditions
Sustained accepted rateTimed output at the final hand-off under normal replenishmentAvoids confusing internal peak movement with usable production
Buffer behaviourTrack full, downstream stop, restart and starvation responseShows how the cell behaves around real line interruptions
Fault & recoveryDefined jams, empty hopper, sensor fault and operator recoveryConfirms safe, understandable return to production
ChangeoverTools, settings, recipes, time and verificationProtects availability across the planned format range
Safety & documentationSafety functions, alarms, manuals, drawings and training recordsSupports handover and lifecycle ownership
Industrial component feeding equipment set up for production trials

PREPARE THE APPLICATION

Useful evidence creates faster, safer decisions.

  1. Annotated component photographs
  2. Drawings, tolerances and format matrix
  3. Samples from normal production variation
  4. Required orientation and receiving-machine layout
  5. Sustained output and operating schedule
  6. Good and reject samples for inspection tasks

Use the complete system specification checklist

Do not send confidential drawings or process information until any required NDA is in place.

PROJECT ASSESSMENT

Start with a clear application brief and representative production parts.

We will help define the right starting architecture, the evidence needed for selection and the interfaces that belong in the project scope.