Sustained accepted rate
State parts per minute at the agreed hand-off, test duration, allowed interventions and representative reject conditions.

USER REQUIREMENT GUIDE
Use this checklist to define the component, accepted output, hand-off, integration and proof needed from a complete automated parts feeding project.
Prepared by the Sortation Solutions project team · Updated 1 September 2026 · Approx. 8 minute read
DIRECT ANSWER
A useful specification describes the complete production outcome and the evidence that will prove it.
Record every part variant, real sample condition, sustained accepted output, final presentation, permissible contact and damage, buffer behaviour, inspection, changeover, controls, safety, access, factory testing, installation and handover. Then state who owns each interface and how acceptance will be measured.
CHECKLIST 01
The supplied sample population must represent the parts the system will meet in production.
| Record | Questions to answer | Evidence to provide |
|---|---|---|
| Full component family | Which variants run now, and which future formats require provision? | Named part list, drawings, CAD and revision status |
| Incoming condition | Are parts oily, dusty, warm, static-prone, tangled, nested or cosmetically sensitive? | Uncleaned production samples and packaging method |
| Natural variation | What dimensional, moulding, stamping, finish or supplier variation is acceptable? | Samples from different batches, cavities and suppliers |
| Difficult population | Which acceptable parts have historically caused misfeeds or damage? | Known difficult but conforming parts, clearly labelled |
| Part contact rules | What surfaces may touch, accumulate or recirculate? | Cosmetic zones, damage limits and cleanliness requirement |
| Trial quantity | Can the required test duration run without excessive reuse? | A representative bulk quantity agreed before the trial |
CHECKLIST 02
Describe what the next process needs at the exact point where responsibility transfers.
State parts per minute at the agreed hand-off, test duration, allowed interventions and representative reject conditions.
Define every axis, face, feature, pitch, height, location tolerance and stability condition required downstream.
Include machine cycle, bursts, micro-stops, planned pauses, recipe changes and restart behaviour.
Define useful accumulation time, first-in/first-out needs, allowable queue pressure and empty/full responses.
List features that must be present or correct, reject destinations, confirmation and any production data required.
Record physical envelope, datum, ownership, existing drawings, available access and permitted machine modifications.
CHECKLIST 03
These requirements turn separate equipment into a usable production system.
State container size, batch weight, loading frequency, operator reach, lift assistance and low-level warning needs.
Define PLC and HMI standards, I/O or network handshakes, recipe ownership, alarms, data and remote support policy.
Record required standards, risk-assessment responsibilities, stops, interlocks, reset zones and safe recovery access.
Set the expected frequency, target method, tooling storage, recipe control, verification and acceptable duration.
Protect cleaning, inspection, adjustment, jam clearance, tooling replacement and planned maintenance routes.
List manuals, drawings, software backups, spares, training, warranty, response and final record requirements.
ACCEPTANCE PLAN
A signed test route prevents “works” from meaning different things to different parties.
| Stage | Define in advance | Example evidence |
|---|---|---|
| Feasibility or development trial | Sample mix, duration, orientation, rate and visible failure modes | Trial record, observations, concept recommendation and open risks |
| Factory acceptance test | Complete scope present, test population, operating states, output, quality and intervention limits | Timed results, reject checks, alarm/recovery demonstration and action list |
| Installation readiness | Utilities, foundations, access, lifting, networks, isolations and receiving-machine status | Signed readiness checklist and interface drawings |
| Site acceptance | Integrated production period, product mix, output, quality, changeover and training | Agreed results, documented exceptions and handover record |
Acceptance values must be tailored to the actual project; the examples above are planning prompts, not contractual criteria.
COMMON QUESTIONS
A requirement can remain technology-neutral while still being technically precise.
It should define the complete component family, sample condition, sustained accepted output, exact hand-off, allowable damage, inspection, buffering, controls, guarding, operator access, changeovers, FAT, documentation, installation and site acceptance responsibilities.
The quantity depends on the feed rate, test duration, recirculation limits and natural variation. Samples should represent normal production and difficult but acceptable parts, not only ideal examples.
Usually it is better to state the required result, constraints and acceptance evidence unless a technology is mandated for a documented reason. This leaves room to select the most suitable complete architecture.
Specify sustained accepted components at the agreed hand-off under representative operating conditions, including normal rejects, replenishment and recovery, rather than a short peak inside the feeder.
REQUIREMENT REVIEW
Send drawings, representative components, output, hand-off and existing-line information for an initial engineering conversation.